Critical Path

Critical Path (2026)

The engineering journey to Starship and beyond.

Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

Date of release
2026-07-10
TMDB
10.0 / 10 (1)
Runtime
34m
Collection
SpaceX Starship Documentary Series

Casting

Recommended